Published • loading... • Updated
Rawson Road level crossing overhaul
Summary by Bicycle Network
2 Articles
2 Articles
Temporary closure: Norfolk Road rail crossing, 2 to 9 Jan 2026
KiwiRail will be carrying out safety upgrade work at the Norfolk Road level crossing in early January. This will include a 24-hour road-closure from 2 to 9 January. Detours will be in place. The diagram below indicates the closure point: Please note, access to the Waingawa Industrial Area will remain open from SH2. Source
Coverage Details
Total News Sources2
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
