Rail Link project on the move
2 Articles
2 Articles
Rail Link project on the move
The next stage of the Sunshine Coast’s major passenger rail project has taken another step forward, with a consortium led by SunLinQ awarded the design and pre-construction contract for the line between Caloundra and Birtinya. The contract marks a significant milestone for Stage 2 of The Wave, which will extend the proposed rail network north from Caloundra, bringing new stations, improved transport connections and a tunnel beneath Little Mounta…
Consortium awarded key contract for The Wave Stage Two
Image: kyrychukvitaliy/stock.adobe.comA contract has been awarded to SunLinQ for the design and pre-construction of The Wave Stage Two between Caloundra and Birtinya in Queensland. The SunLinQ consortium brings together BMD Constructions, CPB Contractors, GS Engineering and Construction Australia and UGL Engineering. The Wave is a major infrastructure project which plans to deliver better roads and more […] The post Consortium awarded key contra…
Coverage Details
Bias Distribution
- 100% of the sources are Center
Factuality
To view factuality data please Upgrade to Premium





