PWD reviewing PCA report before carrying out East-West Highway repairs
3 Articles
3 Articles
PWD reviewing PCA report before carrying out East-West Highway repairs
KOTA BARU: The Public Works Department (PWD) is reviewing the final report of the Pavement Condition Assessment (PCA) to plan road repair works, including along critical routes such as the East-West Highway (JRTB), says Public Works director-general Datuk Roslan Ismail. © New Straits Times Press (M) Bhd
JKR reviewing pavement condition assessment report before starting repairs on East-West Highway
The public works department (JKR) is reviewing the final report of the pavement condition assessment (PCA) for the planning of road repair works, including those for critical routes such as the East-West Highway (JRTB), reported Bernama. The PCA is essential for identifying damaged pavement sections and to determine the most suitable maintenance methods to ensure that available allocations were used optimally, said JKR director-general Datuk Ros…
JKR reviewing PCA report before RM55m East-West Highway repairs to optimise allocation, says D-G - Malaysia now
KOTA BHARU, June 22 — The Public Works Department (JKR) is reviewing the final report of the Pavement Condition Assessment (PCA) to plan road repair works, including along critical routes such as the East-West Highway (JRTB), says Public Works director-general Datuk Roslan Ismail. He said the PCA was essential for identifying damaged pavement sections and determining the most suitable maintenance methods to ensure that available allocations were…
Coverage Details
Bias Distribution
- 100% of the sources are Center
To view factuality data please Upgrade to Premium