Public Notice for Storm Lift Station Excavation — Columbia Community Connection News Mid-Columbia Region
Summary by Columbia Community Connection
1 Articles
1 Articles
All
Left
Center
Right
Public Notice for Storm Lift Station Excavation — Columbia Community Connection News Mid-Columbia Region
The Dalles, Ore., June 15, 2025 — Starting June 16th, there will be a lane shift in front of Bi Mart allowing for the excavation and installation of the 25’ deep, 12’ diameter concrete wet well. The lane shift will utilize the existing shoulder width to the west, towards the Bi Mart Side of W 6th St. The estimated shift will last 3 weeks, at which point excavation for the 24” & 36” storm pipe connecting to the wet well will commence. Please use …
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium