The EIA of the line between the Dragon Stadium and the Souto was the public consultation. The line of 6,9 km, with cost up to 163,8 M€, previews 10,3 million passengers in the 1st year.
The EIA of the line between the Dragon Stadium and the Souto was the public consultation. The line of 6,9 km, with cost up to 163,8 M€, previews 10,3 million passengers in the 1st year.