Port Moody to Split Cost of Replacing Failing Retaining Wall Near Pleasantside Elementary
Summary by The Hamilton Spectator
4 Articles
4 Articles

+2 Reposted by 2 other sources
Port Moody to split cost of replacing failing retaining wall near Pleasantside Elementary
Port Moody council has agreed to split the cost of replacing a deteriorating retaining wall along Barber Street, after staff determined the aging structure is partly a city asset.
·Peterborough, Canada
Read Full ArticlePort Moody to split cost of replacing failing retaining wall near Pleasantside Elementary – Tri-Cities Dispatch
Google image Port Moody council has agreed to split the cost of replacing a deteriorating retaining wall along Barber Street, after staff determined the aging structure is partly a city asset. On July 29, council voted unanimously to contribute up to $90,000 from the city’s reserves toward the $184,000 project, which will see the wood crib wall replaced with an engineered concrete lock-block design. The work is being led by the Coquitlam School…
Coverage Details
Total News Sources4
Leaning Left3Leaning Right0Center0Last UpdatedBias Distribution100% Left
Bias Distribution
- 100% of the sources lean Left
100% Left
L 100%
Factuality
To view factuality data please Upgrade to Premium