Get access to our best features
Get access to our best features
Published 1 year ago

Planners back hydro-electric power plan for near Inverkip

Summary by Ground News
Hydro-electric power scheme would take water in a new four-kilometre pipeline buried between Loch Thom and Inverkip. The facility would be based on the Kip Water using excess spilled from the Loch Thom Reservoir into the Compensation Reservoir. It would then be moved to a powerhouse at Bankfoot through a high pressure buried pipeline.

0 Articles

All
Left
Center
Right
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe
Ground News Article Assistant
Not enough coverage to generate an Article Assistant.

Bias Distribution

  • 100% of the sources are Center
100% Center
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Sources are mostly out of (0)