Published • loading... • Updated
Part of Dalumer Straße Is Closed for Road Construction in the Direction of Bippen From Fürstenau
1 Articles
1 Articles
Road construction on Dalumer Straße: From Fürstenau two kilometers of the K117 towards Bippen are to be renovated. From 6th to 10th October there is a construction site lamp. During the autumn holidays from 13th to 25th October the road is fully closed.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium