OPG acts to remediate soil erosion at Darlington site
1 Articles
1 Articles
OPG acts to remediate soil erosion at Darlington site
Remediation works are ongoing on the scars on the north side of the embankment created south of Energy Drive as part of the Small Modular Reactor program at the Darlington nuclear site. Two smaller cracks are visible. However, earth moving machinery is currently being used on the huge section of soil erosion west of the smaller cracks. “The soil movement work is being conducted under a thoroughly reviewed and accepted environmental assessment wi…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium