A few bolts less for an EHV pylon near Flamanville(Indymedia Nantes, September 30, 2024) The EPR nuclear reactor in Flamanville, on which work which begun in 2006, is nearing completion and could be connected to the power grid this autumn....
After an automatic emergency shutdown on November 24, 2024, reactor No. 1 at the Flamanville power plant should again reach its maximum power this Thursday, November 28.