Skip to main content
See every side of every news story
Published loading...Updated

New Million Flood Restraint Pools for Bayreuth

Summary by mainwelle.de
Protect Bayreuth from flooding: with a total of three flood retention basins, the city of Bayreuth would like to improve its position on this topic. After the basin on the Wilhelminenaue, the second one is to be built on the railway dam of the Bayreuth – Weiden connecting line. The planned basin should be able to absorb up to 950,000 cubic meters of water. This corresponds to a village pond. The city wants to start construction in 2027, which ha…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

Protect Bayreuth from flooding: with a total of three flood retention basins, the city of Bayreuth would like to improve its position on this topic. After the basin on the Wilhelminenaue, the second one is to be built on the railway dam of the Bayreuth – Weiden connecting line. The planned basin should be able to absorb up to 950,000 cubic meters of water. This corresponds to a village pond. The city wants to start construction in 2027, which ha…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

mainwelle.de broke the news in on Tuesday, September 16, 2025.
Sources are mostly out of (0)
News
For You
Search
BlindspotLocal