Published • loading... • Updated
New Million Flood Restraint Pools for Bayreuth
Summary by mainwelle.de
1 Articles
1 Articles
Protect Bayreuth from flooding: with a total of three flood retention basins, the city of Bayreuth would like to improve its position on this topic. After the basin on the Wilhelminenaue, the second one is to be built on the railway dam of the Bayreuth – Weiden connecting line. The planned basin should be able to absorb up to 950,000 cubic meters of water. This corresponds to a village pond. The city wants to start construction in 2027, which ha…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium