Neoen Begins Construction of Tesla Megablock Battery in Australia
2 Articles
2 Articles
Neoen begins construction of Tesla Megablock battery in Australia
Neoen Australia has launched construction of its third big battery in less than 90 days, helping accelerate Australia’s energy transition with 20 GW of utility-scale solar, wind, gas, batteries and pumped hydro now either commissioning or under construction.From pv magazine Australia The Australian arm of France-based developer Neoen has announced the start of construction of the 226 MW/866 MWh Goyder North battery energy storage project in Sout…
Neoen to tap new Telsa tech for South Australian battery project
Neoen Australia has launched construction of its third big battery in less than 90 days, helping accelerate the nation’s energy transition with 20 GW of utility scale solar, wind, gas, batteries and pumped hydro now either commissioning or under construction across the National Electricity Market.The Australian arm of France-headquartered renewable energy and storage developer Neoen has announced the start of construction of the 226 MW / 866 MWh…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
