Published • loading... • Updated
MSW processing plant in Linköping
Summary by RECYCLING Magazine
1 Articles
1 Articles
MSW processing plant in Linköping
The plant was realised by the Dutch company BANZO as system integrator and completed within eleven months. Screening technology supplied by the German manufacturer Spaleck is used to classify material flows and support downstream sorting processes. Capacity and process design The MSW processing plant is designed for an annual capacity of around 200,000 tonnes and processes up to 40 tonnes per hour. The fully automated system separates five fract…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium