Published • loading... • Updated
Mining in Santa Cruz: Fredonia Mining Begins Preliminary Economic Study of El Dorado-Monserrat Project
Summary by elinversorenergetico.com
1 Articles
1 Articles
The company plans to present the results of the evaluation (PEA) during the third quarter of 2026. The study will define the economic viability, the scale of production and the development strategy for the operation of gold and silver located in the Massif del Deseado. Fredonia Mining announced the formal start of the work for the preparation of the Preliminary Economic Assessment (PEA) of its gold and silver project El Dorado-Monserrat (EDM), l…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium