Ma-a Flyover project not being stalled – DPWH-Davao
Summary by MindaNews
1 Articles
1 Articles
Ma-a Flyover project not being stalled – DPWH-Davao
DAVAO CITY (MindaNews / 02 August) — The signage installed near the Ma-a Flyover saying its delayed construction is due to “political pressure” is “false and misleading,” the Department of Public Works and Highways (DPWH)-Region XI said. Photos of the signage as posted on Paulo Lino Canillo Te’s Facebook page on 2 August 2025. The signage, installed near the Maa-Magtuod Flyover project site and accusing the Marcos administration and the DPWH of …
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium