Lane closures scheduled on MO-23 near Knob Noster for corridor upgrades, May 2 - July 2025 | Missouri Department of Transportation
Summary by modot.org
1 Articles
1 Articles
All
Left
Center
Right
Lane closures scheduled on MO-23 near Knob Noster for corridor upgrades, May 2 - July 2025 | Missouri Department of Transportation
Lane closures scheduled on MO-23 near Knob Noster for corridor upgrades, May 2 - July 2025 Visitor (not verified) Mon, 04/28/2025 - 14:20 JOHNSON COUNTY – The Missouri Department of Transportation will be conducting various closures on Missouri Highway 23 between U.S. Highway 50 and Johnson County Route DD beginning on Fri., May 2 at approximately 6 a.m., The work will include signal upgrades, resurfacing from Missouri Business Highway 50 (McPhe…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium