KCPL places lowest bid for NH-66 four-laning project at 37.60% below estimated cost - Goemkarponn
Summary by Goemkarponn - Goa News
1 Articles
1 Articles
KCPL places lowest bid for NH-66 four-laning project at 37.60% below estimated cost - Goemkarponn
Team Goemkarponn Canacona: The bidding process for the four-laning of NH-66 from Benordem (Quepem) to the start of Canacona Bypass (Char Rasta), and from the end of the Bypass (Maxem) to Polem, was opened on Monday, with Kaluwala Construction Private Limited (KCPL) emerging as the lowest bidder. The Ministry of Road Transport and Highways (MoRTH) had floated the tender for the 22.10 km stretch under the Hybrid Annuity Mode, with an estimated pro…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium