J-K: Multiple Gates of Baglihar Hydroelectric Power Project Dam Opened Amid Heavy Rainfall
2 Articles
2 Articles
J-K: Multiple Gates of Baglihar Hydroelectric Power Project Dam Opened Amid Heavy Rainfall
Get latest articles and stories on India at LatestLY. Following continuous heavy rainfall across the upper catchment areas of Doda, Kishtwar and Ramban districts, multiple gates of the Baglihar Hydroelectric Power Project Dam on the Chenab River have been opened to regulate the increased inflow and ensure the safe discharge of excess water from the reservoir. India News | J-K: Multiple Gates of Baglihar Hydroelectric Power Project Dam Opened Ami…
Morbi Machhu-2 dam has been released after it was 100 percent filled. Locals living along the river bed have been warned. 29 villages of Morbi and Malia talukas have been alerted. Water has been released by opening 4 gates of Machhu-2 dam by 7 feet. 18,578 cusecs of water has been released by opening 4 gates of the dam. On the other hand, rescue operations are ongoing in Morbi district despite heavy rains. A minor trapped in Ghuntu village has b…
Coverage Details
Bias Distribution
- 100% of the sources lean Right
Factuality
To view factuality data please Upgrade to Premium
