Published • loading... • Updated
ITD crews prepare to install overhead road signs
Summary by KIFI
1 Articles
1 Articles
ITD crews prepare to install overhead road signs
The closure was planned to last until 11 p.m., but work is planned to continue throughout Wednesday. The signs will be going up between 10 a.m. and 2 p.m., with expected traffic delays due to one lane road closures on the exit off-ramps. These delays could be up to 15 minutes.
·Idaho Falls, United States
Read Full ArticleCoverage Details
Total News Sources1
Leaning Left0Leaning Right0Center1Last UpdatedBias Distribution100% Center
Bias Distribution
- 100% of the sources are Center
100% Center
C 100%
Factuality
To view factuality data please Upgrade to Premium
