Hisingsbron stuck in open position
3 Articles
3 Articles
Bridge researcher about Hisingsbron: "Not a great choice with a lift bridge"
SVT has located 16 instances where the Hisingsbron has had problems with bridge opening since its inauguration four years ago. Now Raid Karoumi, professor of bridge construction at KTH, believes that the type of bridge that the Hisingsbron is is extra sensitive. – It was perhaps not a great choice with a lift bridge, he says.
Hisingsbron stuck in open position
The Hisingsbron in Gothenburg has become stuck in the open position and traffic has been stopped over the bridge, writes Göteborgs-Posten. The fault occurred at around 6.30pm when a bridge flap got stuck when opening, according to the Swedish Transport Administration. – Unfortunately, the bridge has become stuck in a tilted position. The bridge is supposed to be half-open, so all road and sea traffic has been stopped, says Axel Wannersko...
Coverage Details
Bias Distribution
- 67% of the sources lean Right
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage