Skip to main content
See every side of every news story
Published loading...Updated

Grip Measurement on the Kurt Schuhmacher Bridge Provides Temporary Locking

Summary by Blaulicht-Report
Griffigkeitsmessung auf der Kurt-Schuhmacher-Brücke ensures two-hour traffic obstructions The civil engineering office of the city of Koblenz carries out a grip measurement at the Kurt-Schuhmacher-Brücke on Monday, 15 December. The specialists start at 7 pm with the tests of the road deck layer on both ex-ripe roads of the overflyer between Metternich and Moselweiß. The measure improves traffic safety by precisely determining the condition of th…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.Cross Cancel Icon

1 Articles

Griffigkeitsmessung auf der Kurt-Schuhmacher-Brücke ensures two-hour traffic obstructions The civil engineering office of the city of Koblenz carries out a grip measurement at the Kurt-Schuhmacher-Brücke on Monday, 15 December. The specialists start at 7 pm with the tests of the road deck layer on both ex-ripe roads of the overflyer between Metternich and Moselweiß. The measure improves traffic safety by precisely determining the condition of th…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Blaulicht-Report broke the news in on Wednesday, December 10, 2025.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal