Don't Just Read the News, Understand It.
Published loading...Updated

GOBCOL, CIAPACOV and PC Solve Problems of More than 65 Years, Removing Drainage Line From the Colima River

Summary by Estación Pacífico
On Friday, June 20, the Director General of Ciapacov, Vladimir Parra, conducted a follow-up and supervision tour to the work of extracting a 10-inch tube with 24m of extension, which crosses the bridge of the Colima River located on Dr. Miguel Galindo Street, in the Barrio de la Salud, in the center of Colima. These works were carried out in coordination between the Government of the State, CIAPACOV and Civil Protection, in order to reduce the r…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

All
Left
Center
Right

On Friday, June 20, the Director General of Ciapacov, Vladimir Parra, conducted a follow-up and supervision tour to the work of extracting a 10-inch tube with 24m of extension, which crosses the bridge of the Colima River located on Dr. Miguel Galindo Street, in the Barrio de la Salud, in the center of Colima. These works were carried out in coordination between the Government of the State, CIAPACOV and Civil Protection, in order to reduce the r…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Estación Pacífico broke the news in on Saturday, June 21, 2025.
Sources are mostly out of (0)

You have read 1 out of your 5 free daily articles.

Join millions of well-informed readers who use Ground to compare coverage, check their news blindspots, and challenge their worldview.