Scotland – 14/04/2026 – energiesdelamer.eu. Geoquip Marine Operations (Switzerland) and GEO Denmark are preparing to launch a geotechnical investigation campaign at the Bowdun offshore wind farm site in Scotland, developed by Thistle Wind Partners. The two ships, Geoquip Seehorn and Geo Connector, will be used to carry out the surveys, the work that will begin on 19 April. The construction of the park is expected to begin in 2031 off the coast o…
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
Scotland – 14/04/2026 – energiesdelamer.eu. Geoquip Marine Operations (Switzerland) and GEO Denmark are preparing to launch a geotechnical investigation campaign at the Bowdun offshore wind farm site in Scotland, developed by Thistle Wind Partners. The two ships, Geoquip Seehorn and Geo Connector, will be used to carry out the surveys, the work that will begin on 19 April. The construction of the park is expected to begin in 2031 off the coast o…