Gensler submits plans for Phase 1 of £2.5bn housing-led scheme opposite O2
The first phase includes a riverside park and 100% social rent blocks as the wider scheme could eventually deliver about 5,000 homes.
4 Articles
4 Articles
Gensler submits plans for Phase 1 of £2.5bn housing-led scheme opposite O2
The Architects’ Journal Gensler submits plans for Phase 1 of £2.5bn housing-led scheme opposite O2 Gensler has presented plans for the first 1,500-home phase of the £2.5 billion Thameside West development across the river from the O2 Arena The post Gensler submits plans for Phase 1 of £2.5bn housing-led scheme opposite O2 appeared first on The Architects’ Journal Richard Waite
Arada submit planning applications for £2.5bn Thameside West
First two buildings of the development to deliver 100% affordable housing Landscape-led masterplan designed to open up the site for Londoners for the first time, strengthening the connection between the Thames and the Royal Docks Arada, the leading international master developer, has submitted a series of planning applications to the London Borough of Newham to […] The post Arada submits planning applications for £2.5bn Thameside West, unlocking…
Arada submits planning applications for £2.5bn Thameside West, unlocking nearly 1,500 homes, affordable housing and new waterfront park at East London regeneration project
Arada, the leading international master developer, has submitted a series of planning applications to the London Borough of Newham to advance the delivery of Thameside West, one of London’s largest and most ambitious regeneration projects, with proposals that would unlock the delivery of affordable housing and connect the area between the Thames and Royal Docks for the first time. Spanning over 47 acres in London’s Royal Docks, Thameside West ha…
Coverage Details
Bias Distribution
- 100% of the sources are Center
Factuality
To view factuality data please Upgrade to Premium



