El Paso’s Plan to Build Power Plant for Data Center Kicks up Opposition
El Paso Electric plans a 366-megawatt natural gas plant to power Meta’s 1-gigawatt data center, raising concerns over rate hikes and air pollution, with operation expected by 2027.
4 Articles
4 Articles
El Paso’s plan to build natural gas power plant for massive data center kicks up opposition
By Inside Climate News, The Texas Tribune January 26, 2026 This story is published in partnership with Inside Climate News, a nonprofit, independent news organization that covers climate, energy and the environment. Sign up for the ICN newsletter here. EL PASO — In October 2025, local officials celebrated the groundbreaking of a 1-gigawatt, $1.5 billion data center for the tech giant Meta. El Paso Electric had previously stated that existing inf…
El Paso’s plan to build power plant for data center kicks up opposition
This story is published in partnership with Inside Climate News, a nonprofit, independent news organization that covers climate, energy and the environment. Sign up for the ICN newsletter here.EL PASO In October 2025, local officials celebrated the groundbreaking of a 1-gigawatt, $1.5 billion data center for the tech giant Meta.El Paso Electric had previously stated that existing infrastructure would support the data center and that Meta was loo…
Coverage Details
Bias Distribution
- 67% of the sources are Center
Factuality
To view factuality data please Upgrade to Premium


