At the planned new school building in Neuhof (Fulda district), the district administration becomes more concrete: a location directly at the Johannes-Kepler-Schule is favored, as the press office of the district opposite OSTHESSEN-NEWS informs. For the construction the turning loop of the local bus station would have to be shortened.The district is already property owner there and plans a two-storey construction on the slope, for which the bus l…
At the planned new school building in Neuhof (Fulda district), the district administration becomes more concrete: a location directly at the Johannes-Kepler-Schule is favored, as the press office of the district opposite OSTHESSEN-NEWS informs. For the construction the turning loop of the local bus station would have to be shortened.The district is already property owner there and plans a two-storey construction on the slope, for which the bus l…