See every side of every news story
Published loading...Updated

Five Routes Red Modify Its Layout by Repair Work in the Puente Lo Saldes De Vitacura - La Tercera

Summary by La Tercera
Five routes of the Mobility Network will have changes in its layouts since this Tuesday, the result of the repair work in the Puente Lo Saldes, in the commune of Vitacura, in the Metropolitan Region.The works to repair the structure of the viaduct began on July 14, with different interventions in the transit, such as the closing of the right track of the Costanera North towards the east in the mentioned bridge; night closures and the closing of …

1 Articles

Lean Right

Five routes of the Mobility Network will have changes in its layouts since this Tuesday, the result of the repair work in the Puente Lo Saldes, in the commune of Vitacura, in the Metropolitan Region.The works to repair the structure of the viaduct began on July 14, with different interventions in the transit, such as the closing of the right track of the Costanera North towards the east in the mentioned bridge; night closures and the closing of …

·Chile
Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources lean Right
100% Right

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

La Tercera broke the news in Chile on Monday, August 4, 2025.
Sources are mostly out of (0)