See every side of every news story
Published loading...Updated

B220: Emmerich full lock of the connecting ramp between "Klever Straße" and "Eltener Straße"

Summary by Lokalkompass
Emmerich (straßes.nrw). On Monday (14.4.) the roads start. NRW regional branch Niederrhein with the renovation of the connecting ramp of the B220, between the B220 "Klever Straße" and the B8 "Eltener Straße". For this the ramp is fully closed for the car traffic. Reroutes are signposted on site. Coming from Elten a redirection takes place from the "Van-den-Bergh-Straße" via the L7 "Eltener Straße / Steintor / Großer Wall / Ostwall / Bahnhofstraß…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

ikz-online.de broke the news in on Tuesday, April 1, 2025.
Sources are mostly out of (0)

You have read out of your 5 free daily articles.

Join us as a member to unlock exclusive access to diverse content.