Ecoener, Pv Leader in Guatemala with New 74.7 Mwp Plant
4 Articles
4 Articles
Ecoener consolidates its presence in Guatemala with the start-up of the El Carrizo photovoltaic plant, the largest in the country, which has a capacity of 74.7 megawatt peak (MWp), according to the company in a statement.
The Spanish company has launched its largest solar plant in the Central American country to date. The Spanish company Ecoener has announced the start of the commercial operation of the El Carrizo photovoltaic plant, with a capacity of 74.7 MWp, located in the department of Escuintla, in Guatemala, which allows it to reach more than 500 MW in operation, equivalent to an increase of 47% compared to the previous year, according to a statement. The …
The Spanish company Ecoener has started the commercial operation of the photovoltaic plant El Carrizo, with a capacity of 74.7 megawatt peak (MWp), becoming the leader in photovoltaic technology in Guatemala. With this new plant, the company reaches 500 MW in operation, representing a growth of 47% compared to the previous year.The company is the largest Spanish investor in Guatemala after investing 116 million euros since 2024 in the plants El …
Ecoener consolidates its presence in Guatemala with the start-up of the El Carrizo photovoltaic plant, the largest in the country, which has a capacity of 74.7 megawatt peak (MWp), according to the company in a statement. With this new infrastructure, the firm exceeds 500 megawatts (MW) in operation, which represents an increase of 47% over the previous year. Located in the municipality of San José, El Carrizo occupies an area of 112 hectares an…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium