E3 Lithium Begins Site Construction for Phase 2 of the Clearwater Demonstration Facility
4 Articles
4 Articles
E3 Lithium advances Alberta lithium carbonate facility
E3 Lithium (TSXV:ETL) has started construction of its phase-2 lithium carbonate demonstration facility, east of the town of Olds, Alberta E3 Lithium is a critical metal company developing resources of 21.2 million tons of lithium carbonate equivalent (LCE) measured and indicated and 0.3 million tons LCE inferred in Alberta, as well as 2.5 million tons LCE inferred in Saskatchewan E3 Lithium stock has given back 19.17 per cent year-over-year but …
E3 Lithium Begins Site Construction for Phase 2 of the Clearwater Demonstration Facility
E3 Lithium (OTCQX:EEMMF) has begun site construction for Phase 2 of its Clearwater Demonstration Facility east of Olds, Alberta after receiving required permits from the Alberta Energy Regulator on September 11, 2025. Site work includes road access improvements, pad construction, topsoil/subsoil stripping and environmental/safety preparations ahead of a planned drilling program.The company expects the drilling rig to be mobilized in the coming w…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
 
Factuality
To view factuality data please Upgrade to Premium
