Deere Clears the Air; Battery Factory Halted; P&G Cuts 7,000 | Today in Manufacturing Ep. 224
Summary by manufacturing.net
5 Articles
5 Articles
All
Left
Center
Right

+4 Reposted by 4 other sources
Deere Clears the Air; Battery Factory Halted; P&G Cuts 7,000 | Today in Manufacturing Ep. 224
Also on the podcast, Orbic wants to bring back 1,000 tech jobs, American Airlines engine fire caused by fuel leak, Regal Rexnord stops "playing" with AI, Fabcon Precast hit with max penalty and new drone orders mean big changes.
Coverage Details
Total News Sources5
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium