Critical Maintenance Starting on KVR Near Adra Tunnel Above Naramata
REGIONAL DISTRICT OF OKANAGAN-SIMILKAMEEN, BRITISH COLUMBIA, JUL 10 – Critical maintenance on the Kettle Valley Rail Trail includes replacing a failed culvert with a clear-span bridge funded by a 2023 grant supporting stream restoration and safety improvements.
- Scheduled maintenance will begin on the Kettle Valley Rail Trail near the Adra Tunnel in Naramata, as announced by the Regional District of Okanagan-Similkameen .
- A failed culvert will be replaced with a clear-span bridge for stream restoration on Robinson Creek starting July 14.
- Safety access restrictions will be in place between Glenfir and Adra Tunnel, and vehicle access will be unavailable during construction.
Insights by Ground AI
Does this summary seem wrong?
5 Articles
5 Articles
All
Left
2
Center
2
Right


'Critical' maintenance begins on KVR Trail near Naramata's Adra Tunnel
Construction is expected to be completed by late fall 2026
·Keremeos, Canada
Read Full ArticleCritical maintenance on KVR near Adra Tunnel begins (RDOS - Regional District of Okanagan-Similkameen)
) INFORMATION RELEASE Recreation Sites and Trails BC is scheduled to conduct critical maintenance on the Kettle Valley Rail (KVR) Trail starting the week of Monday, July 14, 2025. This project is funded by the Critical Rail Trail Maintenance grant, which was awarded in 2023 for a three-year term, ending in March 2026. Contractors will remove a failed culvert at the KVR and Robinson Creek crossing on the 'second track'. The culvert, located appro…
·United States
Read Full ArticleCoverage Details
Total News Sources5
Leaning Left2Leaning Right0Center2Last UpdatedBias Distribution50% Left, 50% Center
Bias Distribution
- 50% of the sources lean Left, 50% of the sources are Center
50% Center
L 50%
C 50%
Factuality
To view factuality data please Upgrade to Premium