Skip to main content
See every side of every news story
Published loading...Updated

Covering of Gelderland Landfill Full of Steel Slag Begins

Summary by rd.nl
In the Gelderland village of Eerbeek, work has begun on covering a former landfill containing approximately 230,000 tons of steel slag. First, the sides of the several-meter-high mound on the edge of the Veluwe will be covered, with the top to follow in 2027. Currently, 15,000 solar panels sit on top of the mound, which will be temporarily removed to install, among other things, sheeting, drainage mats, and a layer of soil.
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

In the Gelderland village of Eerbeek, work has begun on covering a former landfill containing approximately 230,000 tons of steel slag. First, the sides of the several-meter-high mound on the edge of the Veluwe will be covered, with the top to follow in 2027. Currently, 15,000 solar panels sit on top of the mound, which will be temporarily removed to install, among other things, sheeting, drainage mats, and a layer of soil.

·Apeldoorn, Netherlands
Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

rd.nl broke the news in Apeldoorn, Netherlands on Thursday, October 16, 2025.
Sources are mostly out of (0)
News
For You
Search
BlindspotLocal