The planned new railway stop is now being built in Mussum, which is why the Bocholt-Wesel line was closed. The station is due to go into operation in 2026.
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
The planned new railway stop is now being built in Mussum, which is why the Bocholt-Wesel line was closed. The station is due to go into operation in 2026.