Skip to main content
See every side of every news story
Published loading...Updated

Construction Start for 40 Million Projects in Eggenberg

Summary by 5min.at
The underpass in the Josef-Huber-Gasse is intended to connect Reininghaus directly to the Eggenberg belt. 40.5 million euros will be invested. With 16 February 2026, the starting signal for a central construction project in Graz is set: the "underpass Josef-Huber-Gasse". A new road connection between Eggenberger Gürtel and Alter Poststraße, which is approximately 450 metres long, is planned. The heart of the project is a 150 metre long underpass…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.Cross Cancel Icon

1 Articles

The underpass in the Josef-Huber-Gasse is intended to connect Reininghaus directly to the Eggenberg belt. 40.5 million euros will be invested. With 16 February 2026, the starting signal for a central construction project in Graz is set: the "underpass Josef-Huber-Gasse". A new road connection between Eggenberger Gürtel and Alter Poststraße, which is approximately 450 metres long, is planned. The heart of the project is a 150 metre long underpass…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

5min.at broke the news in on Friday, February 13, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal