Published • loading... • Updated
Construction expected on portion of Coquihalla Highway until Halloween
Summary by Agassiz Harrison Observer
1 Articles
1 Articles
Construction expected on portion of Coquihalla Highway until Halloween
Bridge construction will impact traffic on a portion of the Coquihalla Highway (Highway 5) over the next six months. According to an alert from Drive BC, construction between exits 286 and 290 in Merritt will reduce traffic to one lane in each direction from May 1 until Oct. 31. Speed will be reduced to 50 km/h across the 4.1 km stretch. Per the alert, construction is expected daily from 7 a.m. to 5 p.m. Drive BC advises drivers to expect delays…
·Agassiz, Canada
Read Full ArticleCoverage Details
Total News Sources1
Leaning Left1Leaning Right0Center0Last UpdatedBias Distribution100% Left
Bias Distribution
- 100% of the sources lean Left
100% Left
L 100%
Factuality
To view factuality data please Upgrade to Premium
