Published 2 years ago • loading... • Updated 2 years ago
CNOOC Limited Announces Buzios7 Project Commences Production
CNOOC Limited announced that the Buzios7 Project has commenced production safely on February 16, 2025.
The Buzios oilfield, the largest deep-water pre-salt oilfield, is located in Brazil's Santos Basin, and production is expected to reach up to 1 million barrels per day in the second half of 2025.
Buzios7 includes the production of 15 development wells and utilizes one of the largest Floating Production, Storage, and Offloading units worldwide.
CNOOC Petroleum Brasil Ltda holds a 7.34% interest in the Buzios Shared Reservoir, while Petrobras holds 88.99% interest.