Skip to main content
New Year’s Sale — Build a balanced news diet with 40% off Vantage
Published loading...Updated

CNOOC Limited Announces Buzios7 Project Commences Production

  • CNOOC Limited announced that the Buzios7 Project has commenced production safely on February 16, 2025.
  • The Buzios oilfield, the largest deep-water pre-salt oilfield, is located in Brazil's Santos Basin, and production is expected to reach up to 1 million barrels per day in the second half of 2025.
  • Buzios7 includes the production of 15 development wells and utilizes one of the largest Floating Production, Storage, and Offloading units worldwide.
  • CNOOC Petroleum Brasil Ltda holds a 7.34% interest in the Buzios Shared Reservoir, while Petrobras holds 88.99% interest.
Insights by Ground AI

48 Articles

The Conway Daily SunThe Conway Daily Sun
+43 Reposted by 43 other sources
Center

CNOOC Limited Announces Buzios7 Project Commences Production

HONG KONG, Feb. 16, 2025 /PRNewswire/ -- CNOOC Limited (the "Company", SEHK: 00883 (HKD Counter) and 80883 (RMB Counter), SSE: 600938) announces that Buzios7 Project has commenced production safely.

Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 74% of the sources are Center
74% Center

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Charleston Gazette-Mail broke the news in Charleston, United States on Monday, February 17, 2025.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal