Skip to main content
See every side of every news story
Published loading...Updated

Chubu Electric Power Vice President and Others Resign in Response to Long-Standing Unpaid Hamaoka Nuclear Power Plant Construction Claims: Asahi Shimbun

Summary by Asahi
On the 27th, Chubu Electric Power announced that safety measures for the Hamaoka Nuclear Power Plant (Omaezaki City, Shizuoka Prefecture), which is aiming to restart operations, had not been carried out in accordance with formal contracts and had not been settled for a long period of time. Ichiro Ihara, head of the Nuclear Power Division, has taken responsibility for this.

1 Articles

Lean Left

On the 27th, Chubu Electric Power announced that safety measures for the Hamaoka Nuclear Power Plant (Omaezaki City, Shizuoka Prefecture), which is aiming to restart operations, had not been carried out in accordance with formal contracts and had not been settled for a long period of time. Ichiro Ihara, head of the Nuclear Power Division, has taken responsibility for this.

·Tokyo, Japan
Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources lean Left
100% Left

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Asahi broke the news in Tokyo, Japan on Thursday, November 27, 2025.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal