Published • loading... • Updated
Chubu Electric Power Vice President and Others Resign in Response to Long-Standing Unpaid Hamaoka Nuclear Power Plant Construction Claims: Asahi Shimbun
Summary by Asahi
1 Articles
1 Articles
On the 27th, Chubu Electric Power announced that safety measures for the Hamaoka Nuclear Power Plant (Omaezaki City, Shizuoka Prefecture), which is aiming to restart operations, had not been carried out in accordance with formal contracts and had not been settled for a long period of time. Ichiro Ihara, head of the Nuclear Power Division, has taken responsibility for this.
·Tokyo, Japan
Read Full ArticleCoverage Details
Total News Sources1
Leaning Left1Leaning Right0Center0Last UpdatedBias Distribution100% Left
Bias Distribution
- 100% of the sources lean Left
100% Left
L 100%
Factuality
To view factuality data please Upgrade to Premium
