3 Articles
3 Articles
BC Hydro Planned Power Outage - Port Hardy
A planned power outage is scheduled for the Vancouver Island North region to complete critical maintenance work and infrastructure upgrades. Date: Sunday, May 25 Time: 8 A.M. – 7 P.M. Location Port Hardy (And neighbouring communities!) Here are a few tips to help you plan ahead: Unplug major appliances and electronics. Charge personal devices. Prepare supplies needed for the day (this may include food, water, fuel, and other items). Have a fl…
San Ġwann Sees Upgrade With 3.6KM Of New Power Cables
Over 3.6 kilometres of new electricity cables are being laid in San Ġwann and St Julian’s as part of a €1 million investment to strengthen the local power grid. The project, led by Enemalta in collaboration with Infrastructure Malta and Transport Malta, aims to improve the reliability and flexibility of the distribution network by connecting the Kappara Distribution Centre with several substations. Energy Minister Dr Miriam Dalli and Enemalta Ex…
Coverage Details
Bias Distribution
- 100% of the sources lean Left
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage