6 Articles
6 Articles
AER approves Basslink conversion - Utility Magazine
The Basslink Interconnector in Tasmania. Image: APA Group The Basslink transmission cable will become a regulated asset, after the Australian Energy Regulator (AER) announced its final decision to accept the application from APA Group. In making the final decision, the AER said was guided by the National Electricity Objective (NEO). The AER determined that converting Basslink is more likely to promote efficient investment in, and efficient oper…
Green light for Basslink conversion - Energy Magazine
Image: 1xpert/stock.adobe.com The Australian Energy Regulator (AER) has reversed its draft decision to reject an application to convert Basslink into a Transmission Network Service Provider (TNSP), with the interconnector now set to […] The post Green light for Basslink conversion appeared first on Energy Magazine.
Basslink to be converted to regulated transmission service
The Australian Energy Regulator (AER) has made a final decision to accept an application from APA Group to convert the Basslink transmission cable to a regulated transmission service. Built in 2006 and acquired by APA Group in 2022, Basslink is a 500MW undersea transmission cable that links Loy Yang in Victoria to George Town in Tasmania. It is currently the only electricity interconnector between Tasmania and mainland Australia, although plans …
Coverage Details
Bias Distribution
- 100% of the sources lean Right
To view factuality data please Upgrade to Premium