Skip to main content
See every side of every news story
Published loading...Updated

Brazil Puts a Battery Inside a Transmission Auction

Summary by The Rio Times
Brazil’s regulator opens consultation on a 12.9 billion real transmission auction whose fifth lot contracts a 100 MW battery in Acre.

7 Articles

Learn what the energy transmission auction of 2027 will look like, which foresees R$ 12.9 billion in investments and 29.5 thousand jobs

Proposal brings together 12 lots, 3,245 km of new lines and potential to create 29,540 jobs

Batteries have been evaluated by the Brazilian government first as a way to provide more power for the electric sector

The board of the National Electricity Agency (Aneel) approved on Tuesday, 8, the public consultation on the editorial of the 1st transmission auction

Agency board opens public consultation on an estimated April 2027; lot 11 has electrical integration Brazil-Bolivia

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources lean Right
100% Right

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

CNN Brasil broke the news in São Paulo, Brazil on Tuesday, September 8, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal