A Panoramic View of the Completed Installation of the 3,400-Ton "Steel Coconut Leaf" Bridge Across the Saigon River; People Eagerly Capture This Special Moment.
4 Articles
4 Articles
Ho Chi Minh City held a ceremony to connect the main span of a pedestrian bridge across the Saigon River, linking Bach Dang Wharf with the Thu Thiem New Urban Area. The project, designed in the shape of a coconut leaf, has a total investment of nearly 1,000 billion VND. [The text then abruptly switches to a different topic:] ...
Dai Dri 360 (Dai Dri) - On the morning of October 21, the “water coconut leaf” pedestrian bridge over the Saigon River is officially smooth after the process of workers and engineers meticulously aligning each link
After more than a year of construction, the main span of the pedestrian bridge across the Saigon River has been put into position, connecting Ben Bach Dang Park with the riverbank of the Thu Thiem New Urban Area. The joining of the two sections was completed on the morning of October 21st, marking an important milestone for the project.
On the morning of October 21st, the pedestrian bridge over the Saigon River connecting Ben Bach Dang Park with the Thu Thiem New Urban Area was officially completed, moving into the final stage of construction.
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium







