Areas protected by eight tidal control gates in Ho Chi Minh City were flood-free during high tide on Wednesday afternoon, while unprotected neighborhoods such as Thanh Da and Thao Dien were inundated. - VnExpress International
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
The 10-160 meter wide drainage system, part of a nearly 10 trillion VND tidal barrier project in Ho Chi Minh City, began operating continuously for the first time on the afternoon of November 25th, coinciding with a high tide. On some roads previously heavily flooded, such as Tran Xuan Soan and Nguyen Binh, the road surface was observed to be dry during the trial period, even when the water level outside exceeded 1.8 meters.