Road Realignment Allows Work to Continue on Constructing HS2 Green Tunnel
4 Articles
4 Articles
Work begins on next phase of HS2’s longest ‘green tunnel’ after road realigned
Work to extend HS2’s longest cut-and-cover “green tunnel” has stepped up after engineers realigned a local road to free space for further excavations near Greatworth, West Northamptonshire. The post Work begins on next phase of HS2’s longest ‘green tunnel’ after road realigned appeared first on New Civil Engineer.
Work moves forward on HS2’s longest green tunnel
The realignment of the B4525 allows the excavation of the Greatworth tunnel, HS2’s longest cut-and-cover tunnel, to continue at pace The tunnel will stretch for 2.7km, making this HS2’s longest green tunnel, created using the ‘cut-and-cover’ method, which places soil back on top of the tunnel to blend it into the surrounding countryside. The first kilometre of the tunnel has already been assembled, and work can now start on the next stage. The t…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium