Published • loading... • Updated
Work Is Progressing to Repair the Sinkhole on San Miguel Street
Summary by deia.eus
1 Articles
1 Articles
The repairs to the San Miguel Street subsidence area are continuing according to the planned schedule, and are currently in one of the most important phases: the installation of prefabricated concrete boxes that will form the new passage for the San Martin stream. These boxes — like large prefabricated tunnels — guarantee a larger space for the passage of water than was previously the case, helping to prevent flooding, especially in areas like G…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium