Skip to main content
See every side of every news story
Published • loading... • Updated

Waiting on Sulin Can Cost a Ship $160,000 in 40 Days

The long wait for ships on the Sulina raid creates significant additional costs for carriers. The post Waiting on Sulin can cost a ship $160,000 in 40 days appeared first on Ukrainian Shipping Magazine — Shipping News of Ukraine and the World.
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

2 Articles

The long wait for ships on the Sulina raid creates significant additional costs for carriers. This was reported by the operations manager of Avalon Shipping Ekaterina Kononenko. She told of a ship that arrived on the Sulina raid on September 25, and which as of October 27 had spent more than a month waiting and is still about 50th in line. According to Kononenko, [...] The post Waiting on Sulin can cost the vessel up to $160,000 first appeared o…

The long wait for ships on the Sulina raid creates significant additional costs for carriers. The post Waiting on Sulin can cost a ship $160,000 in 40 days appeared first on Ukrainian Shipping Magazine — Shipping News of Ukraine and the World.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Ukrainian Shipping Magazine — Новости судоходства Украины и мира broke the news on Tuesday, October 27, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal