The State Water Commission (CEA) and the Federal Electricity Commission (CFE) carried out verification and calibration work on the pipeline measurement systems that carry treated water from the Tenorio Waste Water Treatment Plant (PTAR) to the Villa de Reyes thermoelectric. According to...
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
This infrastructure leads 190 liters per second of treated water for industrial use, which allows to take advantage of the residual resource By: Editorial As part of the actions to guarantee a responsible use of water, the State Government, through the State Water Commission (CEA), and the Federal Electricity Commission (CFE) carried out [...]
The State Water Commission (CEA) and the Federal Electricity Commission (CFE) carried out verification and calibration work on the pipeline measurement systems that carry treated water from the Tenorio Waste Water Treatment Plant (PTAR) to the Villa de Reyes thermoelectric. According to...