See every side of every news story
Published loading...Updated

Preparation Underway for Town Common Bulkhead, Esplanade Project

Summary by Reflector
Work has begun on a project designed to enhance flood protection for the Greenville Town Common.

3 Articles

The rector of the UA of C, Octavio Pimentel Martínez, said that the faculties of Engineering and Architecture of that house of studies, work on an infrastructure project whose purpose will be to avoid flooding in the Unit Campo Redondo de Saltillo, same that he said, was one of the most affected by the overflow of nearby streams, after the intense rains that were recently recorded in this capital.

After the heavy rains recorded last July 6 in Saltillo, which caused floods in several parts of the city, the Autonomous University of Coahuila (UAdeC) is preparing a project to avoid future impacts, particularly in its Camporredondo Unit, where water entered several of the campus buildings.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources lean Left
100% Left
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Vanguardia broke the news in on Monday, July 14, 2025.
Sources are mostly out of (0)

Similar News Topics

You have read 1 out of your 5 free daily articles.

Join millions of well-informed readers who use Ground to compare coverage, check their news blindspots, and challenge their worldview.