The Ministry of Ecological Transition and the Board increase their respective economic endowments to the pact signed in November 2023 The construction of the Matalascañas treatment plant and the restoration of the Guad canal must still be signed.
The Ministry of Ecological Transition and the Board increase their respective economic endowments to the pact signed in November 2023 The construction of the Matalascañas treatment plant and the restoration of the Guad canal must still be signed.