The Municipality of Santa Fe, through the Directorate of Road Maintenance, carries out the work of opening, paving and ordering of Urquiza Street, in the section between Independencia and Colón streets. The intervention, which has an official budget of 120 million pesos, contemplates the execution of 680 linear meters of gutter cord on a previously constructed drain, along with the placement of 300 tons of 10/30 granular material along 420 linea…
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
The Municipality of Santa Fe, through the Directorate of Road Maintenance, carries out the work of opening, paving and ordering of Urquiza Street, in the section between Independencia and Colón streets. The intervention, which has an official budget of 120 million pesos, contemplates the execution of 680 linear meters of gutter cord on a previously constructed drain, along with the placement of 300 tons of 10/30 granular material along 420 linea…